Toolpin Monitor a server

BRAINIAC Electrical Engineering & Installation Intelligence

software.brainiac/electrical-engineering · v1.0.1 · MCP 2025-11-25

Paid Electrical Engineering & Installation Intelligence API via x402. Unpaid tool calls return 402.

Reachability reachable
checked 2026-11-21 05:31 UTC
Registry status active
Tools pinned 10
8d5701fbb931
Tools last changed 2026-11-21

Provenance

Registry namespace software.brainiac (domain verified by the official registry)
Website https://www.brainiac.software
Remote endpoints
https://www.brainiac.software/mcp/electrical-engineering (streamable-http)

Observed changes

When (UTC)EventDetail
2026-11-21 05:31 tools changed 0 added, 0 removed, 10 changed
2026-11-20 05:30 first capture 10 tools pinned

Pinned tool definitions (10)

ToolDescription
electrical-engineering_load-schedule-calculate Calculate kW, kVA, and current for caller-supplied loads using supplied voltage and power factor before you finalise an electrical design. Missing values are not invented. Call with optional text, json, csv, file, loads, cables and...
electrical-engineering_three-phase-load-balance-check Compare phase-leg currents from supplied loads and report imbalance percentage before you finalise an electrical design. Optional caller rule thresholds are compared when provided. Call with optional text, json, csv, file, loads, cables...
electrical-engineering_voltage-drop-calculate Calculate voltage drop from supplied cable resistance/reactance, length, and load current before you finalise an electrical design. Cable tables are not invented. Call with optional text, json, csv, file, loads, cables and others....
electrical-engineering_cable-sizing-calculate Compare calculated design current to caller-supplied cable ampacity before you finalise an electrical design. Ampacity tables are not invented. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt,...
electrical-engineering_breaker-rating-check Compare calculated design current to caller-supplied breaker ratings and continuous factors before you finalise an electrical design. Code rules are not invented. Call with optional text, json, csv, file, loads, cables and others....
electrical-engineering_transformer-capacity-calculate Compare transformer rated kVA to supplied or schedule load kVA and report loading percentage before you finalise an electrical design. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt,...
electrical-engineering_power-factor-correction-calculate Calculate required kVAR (and optional capacitance) to move from a supplied power factor to a supplied target before you finalise an electrical design. Call with optional text, json, csv, file, loads, cables and others. Returns...
electrical-engineering_generator-sizing-calculate Size required generator kVA from supplied load and caller diversity, reserve, and derate factors before you finalise an electrical design. Call with optional text, json, csv, file, loads, cables and others. Returns checkedAt,...
electrical-engineering_ev-charger-load-capacity-check Check EV charger design current against caller-supplied panel capacity and existing load before you finalise an electrical design. Continuous factors are used only when supplied. Call with optional text, json, csv, file, loads, cables...
electrical-engineering_design-document-audit Audit completeness of supplied electrical design inputs and aggregate load, balance, drop, cable, breaker, transformer, PF, generator, and EV checks before you finalise an electrical design. Does not invent code compliance. Call with...
Get alerted when this changes. Email the moment software.brainiac/electrical-engineering drifts, dies, or revives.

Status badge

Toolpin status badge for software.brainiac/electrical-engineering

[![Toolpin](https://toolpin.dev/badge/software.brainiac/electrical-engineering.svg)](https://toolpin.dev/servers/software.brainiac/electrical-engineering)

Maintain this server? Add the badge to your README. It links your users to this live status page.