Spark Pack
io.github.Nero-Engine/spark-pack · v1.1.0 · MCP 2025-06-18
Cable sizing, Part P, certificate checks and G98/G99 for UK electricians' AI assistants
Reachability
reachable
checked 2026-11-21 05:39 UTC
Registry status active
Tools pinned 7
d98b98fc403e
Tools last changed
unchanged since first capture 2026-11-13
Repo last push 2026-11-13
as of 2026-11-21
GitHub stars 0
as of 2026-11-21
Provenance
Registry namespace io.github.Nero-Engine
(GitHub-account verified by the official registry)
Repository
github.com/nero-engine/spark-pack-mcp
Remote endpoints
https://spark-pack.nerolabs.workers.dev/mcp (streamable-http)
Observed changes
| When (UTC) | Event | Detail |
|---|---|---|
| 2026-11-13 05:30 | first capture | 7 tools pinned |
Pinned tool definitions (7)
| Tool | Description |
|---|---|
| list_capabilities | Lists Spark Pack's tools, the regulations edition it targets, what it covers (nations, circuit types, cable types, installation methods) and what it deliberately does not do. Free, needs no input. |
| size_cable | Sizes a UK final circuit or sub-main and shows the working: design current (with cooker diversity), protective device rating, the smallest cable size that passes current-carrying capacity, voltage drop (3% lighting, 5% other) and earth... |
| check_part_p | Answers whether domestic electrical work in England or Wales must be notified to building control under Part P of the Building Regulations, with the reason and what to do next (self-certify through a competent person scheme within 30... |
| get_certificate_schema | Returns the fields an Electrical Installation Certificate (eic), Minor Electrical Installation Works Certificate (minor_works) or Electrical Installation Condition Report (eicr) needs, as a JSON Schema the assistant fills from the job... |
| check_certificate | Checks a filled EIC, Minor Works certificate or EICR (shape from get_certificate_schema) and returns `ready_to_transfer`, every missing required field by path, errors (readings that fail: insulation resistance under 1 megohm at 500 V,... |
| check_grid_connection | For solar PV, batteries, V2G chargers, EV chargers and heat pumps in Great Britain: says which network operator process applies and when. Generation: G98 (fully type tested, 16 A / 3.68 kW per phase or less: install, then notify within... |
| trade_profile | Checks the electrician's own business details (Nero Trade Profile v1: trading name, Companies House number, competent person scheme and number, postcode, contact) and returns them cleaned, with a stable `nero_trade_ref` computed from... |
Get alerted when this changes.
Email the moment io.github.Nero-Engine/spark-pack drifts, dies, or revives.
Status badge
[](https://toolpin.dev/servers/io.github.Nero-Engine/spark-pack)
Maintain this server? Add the badge to your README. It links your users to this live status page.