HeroX AirDomes Product
com.heroxairdomes/mcp · v1.1.0 · MCP 2025-06-18
Air dome facts, planning packages, consultation booking, and ROI, OPEX and financing calculators.
Reachability
reachable
checked 2026-11-21 05:41 UTC
Registry status active
Tools pinned 9
d2c811fa4bc7
Tools last changed
unchanged since first capture 2026-11-11
Provenance
Registry namespace com.heroxairdomes
(domain verified by the official registry)
Remote endpoints
https://www.heroxairdomes.com/api/mcp (streamable-http)
Observed changes
| When (UTC) | Event | Detail |
|---|---|---|
| 2026-11-11 05:30 | first capture | 9 tools pinned |
Pinned tool definitions (9)
| Tool | Description |
|---|---|
| get_company_overview | Summary of HeroX AirDomes: applications, typical project budgets, sizes, lead times, options, warranty and financing. Use before answering any pricing or capability question. |
| list_planning_packages | List the fixed-price planning packages a customer can buy online (concept sketch, renders, custom virtual tour, technician site visit) with IDs and USD prices. |
| start_planning_package_purchase | Get the checkout link for a planning package so the user can pay securely on heroxairdomes.com. Does not charge anything; the user completes payment themselves. |
| book_consultation | Get the booking link for a free 1:1 product overview and ROI estimate call with the HeroX team. Use when the user wants a quote, a site-specific price, or to talk to sales. |
| list_site_pages | List the main pages of heroxairdomes.com with absolute URLs and what each page is for. |
| calculate_dome_roi | Run the HeroX ROI calculator (https://www.heroxairdomes.com/resources/roi): payback period, 5- and 10-year ROI, net annual income and a 10-year cumulative cash flow. All money in USD. This is an estimate for planning purposes only, not a quote. |
| estimate_dome_opex | Run the HeroX OPEX calculator (https://www.heroxairdomes.com/resources/opex): annual and monthly costs for fan/inflation, heating, cooling and lighting. Length, width and target temperature are always given in ft and °F (the page's... |
| estimate_additional_costs | Run the HeroX Additional Costs Estimator (https://www.heroxairdomes.com/resources/additional-costs): foundation, permitting, site prep, utilities, cranes, workforce, HVAC and (US) general contracting costs beyond the dome itself. US... |
| estimate_financing_payment | Run the HeroX Financing Calculator (https://www.heroxairdomes.com/resources/financing): monthly payment, financed amount, total interest and total cost in USD. Assumes 10% down and 8% APR. Options from $0 down and rates from 5.99%... |
Get alerted when this changes.
Email the moment com.heroxairdomes/mcp drifts, dies, or revives.
Status badge
[](https://toolpin.dev/servers/com.heroxairdomes/mcp)
Maintain this server? Add the badge to your README. It links your users to this live status page.